ASTM A513 Type 5

ASTM A513 Type 5 DOM Tube Supplier

For an A513 Type 5 order, confirm three identities before comparing prices: Type 5 DOM, the steel grade and the thermal condition. Then identify which OD, ID and wall limits control the component. This creates a reviewable purchase requirement instead of treating “DOM” as a complete material designation.

Type 5 is a manufacturing type within A513, not a chemical grade. The registered page remains in the grades directory for discovery, while the technical content keeps type and grade separate.

Type identity

Make the Type 5 order unambiguous

Type 5 names a manufacturing route inside A513. It sits in the same callout as the steel grade and the thermal condition, and each of the three is a separate requirement that has to be resolved before offers can be compared.

Decide whether ASTM A513 Type 5 DOM tube is the right route for the intended component
DecisionWhy it matters hereBefore you enquire
A drawing explicitly calls for Type 5The exact type belongs on the quotation and certificate review.Reject a silent change to another A513 type.
The drawing says only “DOM”Grade and thermal condition still need resolution.Ask the design authority to complete the material callout.
The drawing says seamlessA Type 5 welded product is outside that route requirement.Obtain approval before considering a different specification.

Explore the full steel-tubes range to compare the seamless, welded, ERW, mechanical and precision routes on one page before the drawing is fixed.

Illustration: keep independent order identities separate. An original schematic prepared for this page — the three specification tabs are shown blank because each record is filled from the drawing and the ordered edition. It is not a photograph of Noor Deira Steel stock, premises, certificates or test results.

Enquiry builder

ASTM A513 Type 5 DOM Tube Specification — enquiry builder

Capture the decisions below, prepare a review summary and copy it to the tube RFQ. Check that the offer explicitly states Type 5, steel grade and thermal condition. Have the mill resolve simultaneous dimensional limits and supplementary testing before order acceptance.

ASTM A513 Type 5 DOM Tube Specification

Complete the fields with the values your drawing and governing standard edition actually require. Nothing is transmitted from this page — the summary is prepared locally so it can be pasted into the steel-tubes RFQ.

Fields marked * are required. Use mm for OD, ID and wall dimensions and tolerances, m for length, and an explicit quantity unit. Enter positive quantities and lengths; piece counts must be whole numbers. If a design detail is unresolved, describe the decision needed rather than guessing a grade.

Complete the specification to prepare a review summary.

Your prepared specification will appear here. No enquiry has been sent.

Nothing has been sent or transmitted from this page.

Prepared on this page only. Opening the RFQ does not submit anything — the destination form owns contact collection and returns its own acknowledgement.

/products/steel-tubes/grades/astm-a513-type-5-dom-tube/

Acceptance basis

Put the acceptance basis on the order

Type 5 is a manufacturing type within A513, not a chemical grade. The registered page remains in the grades directory for discovery, while the technical content keeps type and grade separate.

Specification decisions for ASTM A513 Type 5 DOM tube, their applicability and limits, the evidence to request and the RFQ action
Specification decisionApplicability and limitEvidence to requestRFQ action
Type designationThe type describes the manufacturing route.Offer and mill documentation explicitly identifying Type 5.Keep Type 5 outside the chemistry field.
Grade and conditionOne type does not fix all material properties.Ordered grade, treatment and applicable test evidence.State grade, condition and required properties.
Dimensional basisA part can depend on bore, OD or wall in different ways.Agreed limits for the ordered type and size.Mark controlling dimensions and measurement method.
Supplementary requirementsOptional requirements need explicit agreement.Accepted order schedule and inspection plan.List additional tests and acceptance owner.

No tolerance value, chemistry limit or mechanical-property requirement is published on this page. Every figure used in a live enquiry must come from the ASTM A513/A513M edition the contract invokes or from your own drawing.

Documentation

Documents that support an A513 Type 5 DOM tube order

Review the offer for silent type or condition changes before production. At release, compare the actual heat record, type identity and agreed dimensional report with the purchase order rather than relying on the DOM label.

Material and document acceptance for ASTM A513 Type 5 DOM steel tube
ControlWhat to examineWhen and limitsNext action
Type designationOffer and mill documentation explicitly identifying Type 5.Before material acceptance; confirm feasibility and cost at quotation.Keep Type 5 outside the chemistry field.
Grade and conditionOrdered grade, treatment and applicable test evidence.Before material acceptance; confirm feasibility and cost at quotation.State grade, condition and required properties.
Dimensional basisAgreed limits for the ordered type and size.Before material acceptance; confirm feasibility and cost at quotation.Mark controlling dimensions and measurement method.
Heat and item identityMill test certificate linked to heat markings and packing list.Before release and again on receipt; a sample certificate is not evidence for the shipped heat.Request traceability through cutting, bundling and delivery.
Illustration: check the dimensions that control the part. An original schematic prepared for this page — the gauge faces carry no lettering and the instruments show no reading, because no measurement or test result is asserted here. No supplier facility, certification, logo or endorsement is depicted.

Duty and drawing

Follow the operating duty to the right specification

The drawing and service envelope govern acceptance. These paths address different purchasing decisions; an application label does not approve a material.

Illustration: preserve identity when stock becomes production pieces. An original schematic prepared for this page — the heat tags are shown blank because the heat number and grade are recorded against the supplied material. No supplier premises, certification or test result is depicted.

GCC markets

Plan the GCC destination around the Type 5 supply

Use the destination to close the quotation scope, then confirm feasibility and commercial terms in writing. Country flags identify the destination; quotation must confirm the supply route, origin and availability for this order.

Show Type 5, chemistry grade and condition separately on destination item records. Identify the emirate, fabricator or site address and unloading restrictions; distinguish a domestic handover from an import leg.

Show Type 5, chemistry grade and condition separately on destination item records. Name the consignee, importer and final site; ask who confirms product classification and border documentation before dispatch.

Show Type 5, chemistry grade and condition separately on destination item records. State the nominated receiving point and project document approver; align certificate review with the required arrival window.

Show Type 5, chemistry grade and condition separately on destination item records. Specify the actual port, border point or inland site requested; separate the entry leg from onward transport and unloading.

Show Type 5, chemistry grade and condition separately on destination item records. Identify the contractor or fabrication yard receiving the tubes; agree import-document responsibility and the named delivery place.

Show Type 5, chemistry grade and condition separately on destination item records. Confirm whether the order is for local consumption or onward shipment; name the consignee and agree who handles each transport leg.

Commercial

Compare offers on the same delivered scope

Request a line-by-line exception schedule for type, grade, condition, cut length and inspection. Compare rejected-length allowance and minimum order basis as well as price; apparent dimensional similarity does not make a different type equivalent.

Ask for the offered mill and origin, tube schedule, quantity basis, processing scope, packing, commercial validity and exclusions. State the Incoterm with its named place and edition, who unloads, and the requested delivery window. Price, availability, production allocation, transport feasibility and dates require written confirmation — this page does not publish a price, and every figure remains price on request.

Coordinate an export enquiry — align tube identification, bundle protection and transport documents with the named delivery place before dispatch.

Adjacent decisions

Resolve the remaining specification decisions

Use these checks to finish the Type 5 callout before requesting competing offers.

Expert insight

Expert Insight: Why must Type 5 and grade be separate?

ASTM lists type and grade as different specification dimensions. A Type 5 callout therefore leaves chemistry unresolved.

Buyer implication: give the purchaser separate fields for type, grade and condition.

Method: review of the publisher’s classification and order-scope description. Applicability: A513 type/grade distinction. Limit: does not reproduce detailed acceptance clauses or certify an offered heat.

ASTM A513/A513M-25 classification · Information reviewed 2026-10-16.

Acceptance controls

Make acceptance easier to demonstrate

Three controls carry most of the acceptance risk on a Type 5 order. Each one is settled before the purchase order, not at the machining centre.

Type designation

Offer and mill documentation explicitly identifying Type 5.

Keep Type 5 outside the chemistry field.

Grade and condition

Ordered grade, treatment and applicable test evidence.

State grade, condition and required properties.

Dimensional basis

Agreed limits for the ordered type and size.

Mark controlling dimensions and measurement method.

From specification to receipt

Close each decision before releasing the order

A Type 5 order passes four gates. Each one has an owner, a required input and an output that can be checked — and each one can fail silently if it is left open.

Responsibilities from specification to receipt for an ASTM A513 Type 5 DOM tube order
Stage and ownerRequired inputEvidence or outputRisk and next action
Engineering release — Buyer’s design authorityApprove a complete Type 5, grade and thermal-condition callout.Approved specification and drawing revisionUnapproved substitution can change the design basis. Close the item before proceeding.
Offer review — Buyer and quotation teamResolve mill exceptions against the controlling dimensional schedule.Written technical exceptions and commercial scopeAn unlisted exception can survive into the purchase order. Close the item before proceeding.
Material release — Mill, inspector and buyer as agreedAccept heat-linked tests and the agreed Type 5 documentation.Accepted documents linked to the order itemsMissing heat identity can make an otherwise correct tube unacceptable. Close the item before proceeding.
Receipt and reconciliation — Receiving teamReconcile cut lengths and item markings before production use.Delivery record, item count and discrepancy recordRecord any mismatch before the material is incorporated into work. Close the item before proceeding.

FAQ

Questions before you place the tube order

Short answers to the points that most often delay a Type 5 enquiry.

Is Type 5 a steel grade?

No. It identifies the DOM manufacturing type. A steel grade and thermal condition are separate requirements.

Can another A513 type be offered?

It may be quoted as an explicit exception, but the design authority must approve it before purchase.

Does this route move if Type 5 is not a grade?

The registered URL stays unchanged. The content and enquiry fields correctly distinguish the manufacturing type from chemistry.

Can OD and wall arithmetic guarantee ID?

No. Actual bore depends on the accepted dimensional limits and measurements. State the controlling dimensions.

Must supplementary tests be requested?

Any requirements beyond the agreed base specification need explicit order agreement, including method, sampling and acceptance.

Is a Type 5 certificate enough for the finished part?

It supports incoming material acceptance. Finished-part dimensions, fatigue, welding or pressure qualification require the applicable separate approvals.

Enquiry handoff

Turn this requirement into a reviewable enquiry

Check that the offer explicitly states Type 5, steel grade and thermal condition. Have the mill resolve simultaneous dimensional limits and supplementary testing before order acceptance.

Include the completed fields and the controlling drawing revision so exceptions can be returned against the right requirement. Prepare and copy the summary above, then open the steel-tubes RFQ and paste it into Your requirement. Add your name, company and reply email on that form. Supporting drawings can be shared through the destination’s verified contact process.

This page prepares your enquiry locally. Opening the RFQ does not submit it. A submission is complete only when the receiving form returns a genuine acknowledgement.

WhatsApp / Mobile

+971 56 398 0860

Address

Office 3303, Churchill Executive Tower, Business Bay, Dubai, United Arab Emirates

Working Hours

Monday – Saturday: 8.00 AM – 6.00 PM
Sunday: Closed